.jpeg)
About
Detailed Case Study
Polo Towers, a chain of luxury hotels and resorts, had reduced visibility into the condition and location of their in-room high-value assets, like screens and speakers. With Grid, they have set up a QR-code-powered end-to-end Asset Management and Audit System in less than a month. They can now track the movement and condition of every asset in real time, with a few clicks.
Grid x Polo Towers At A Glance
5 Sites
200+ Rooms
20,000+ Assets
550+ Audits
Timeline
How did Grid & Hotel Polo Towers collaboration come about?
Grid and Polo Towers first partnered in May 2022 for:
1. End-to-end Asset Management managed by QR codes at a granular level
2. Foolproof Audits with KPI Extraction for Intelligent Business Decision
3. Expenditure Analysis powered by accurate Data Collection
.png)
Snapshot
Who's using Grid @ Hotel Polo Towers?
.png)
Before Grid
Hotel Polo Towers used to rely on a number of independent software solutions that had to be patched together to achieve a somewhat workable solution. Grid combines and makes available all those separate functionalities in a single powerful and flexible tool:
MS Excel / Google Sheets
Usage:
• Non-standardized data collected from multiple sources
• Manual collation on Excel by MIS Teams
• Sheets forwarded to Project Heads for final check and commissioning.
Issues:
• Lack of Data Synchronization and Version Control in MS Excel
• Time-consuming and prone to input errors
• Difficulty in Progress Tracking
WhatsApp / Phone
Usage:
• Data Collection (primarily photos) on Phone
• Photos of assets shared via WhatsApp
• Issues raised via Phone calls/WhatsApp
Issues:
• Frequent disruptions, delays, and errors
• Zero standardization of data
• No Automated Tracking System for Insight and Visibility
Operations @ Hotel Polo Towers Powered By Grid
Asset Management and Tracking
• Creation of asset location master database that manages and tracks 20000+ Assets
• Real-time asset location tracking system across multiple sites and warehouse
• Stock visibility and management system to facilitate fault-free Hospitality
Key Benefits
• QR ensures instant reporting of asset health and location
• Quick communication and resolution of issues
• Proactive inventory management and transportation
Asset Audit
• Digitized quality checklists to ensure consistency
• Automated QR-powered reporting for bulk visual inspections
• Instant alert mechanism
Key Benefits
• Seamless bulk upload of data processed in audits
• Decision-makers have the power to conduct random audits smoothly
How Hotel Polo Towers uses Grid
.png)
Asset Management and Tracking System
• Creation of a master database for all assets across multiple sites
• Automated purchase order and approval channel for inventory restocking
• Proactive asset procurement planning wrt on-site demand and usage
• Expenditure analysis based on inventory consumption
• Real-time asset location tracking
Step 01: Every hotel asset has a QR code assigned, which contains the history of data associated with it, up to the present. This provides 100% visibility for managers to stay on top of their inventory.
Step 02: From the asset audit data, managers can use asset management sheets to initiate stock adjustments, inventory fulfillment, repair and maintenance, and asset tracking
.png)
Asset Audit
• Instant audits post-checkout using Grid’s digital forms
• Zero data misreporting due to quality checklist and image verification modules
• Bulk upload of data with automated tabulation turn audit analysis into an extremely user-friendly experience
• Multiple sets of QR codes for layered audits - sites, rooms, and assets.
Step 01: Post-checkout, the hotel management staff visits the rooms to inspect the condition of every asset present.
Step 02: Assets are QR-coded on an individual and per-room basis, with one scan of the door providing insight into the total asset value of a room.
Step 03: The staff scan the QR code on every asset and fill in the checklist, which can be personalized for different types of assets.
Step 04: Any issue with the condition of an asset or its stock can be raised on the spot via the Grid mobile app.
Step 05: Automatic Email generation notifying the IT Manager and Hotel Manager, who can then use the Asset Management System to resolve the issue.
.png)
Related case studies

Task Automation and Management with Grid’s BPM (Business Process Management) Solution
A utility enterprise automated their workflow management with Grid’s no-code BPM. Read on how they achieved seamless integration between systems, improving operational responsiveness and efficiency.

Grid for Water Utility Project Management
Discover how Grid was implemented by a water EPC giant to address challenges in data management, hindrance tracking, material management, and more.